Installation of floor formwork above commercial premises
Formwork is installed to fill the floor slab, which will become the basis between the floors.
Masonry of walls in the parking lot
The construction of the walls in the underground parking is carried out using high-quality materials that ensure the durability of the structure.
Waterproofing of the parking lot walls
Waterproofing is installed to protect the parking lot walls from moisture penetration.