Месяц October

As of the beginning of October, the following general construction works were carried out on house №8: 1. Earthworks – 100% 2. The foundation of the house is 100% 3. Tower crane foundation – 100% 4. Frame of the building – 100% 5. Waterproofing of foundations – 100% 6. Brickwork – 100% 7. Internal engineering […]

Read more

We continue to share with you the news from the construction site of the residential area “Kyivsky”for October 2020. ⠀ The following works were performed on the house number 7: ⠀ -Installation of the floor slab of the seventh floor in section 2; 3. -Attachment of walls and columns of the fifth floor on 1 […]