In ZhK “Kyivskyi” as of 31.07.2020 the following works on the house number 7 are executed:
⠀
1. the device of a plate of overlapping of the 3rd floor on 2-3 sections.
2. the device of a plate of overlapping – 2 floors of 1 section.
3. installation of brick walls and basement 2-3 sections.
⠀